Author: J. Black

Hardin Valley Academy

Knoxville, TN – Parking Lot Existing lighting consists of 400w metal halide shoeboxes, mounted to 30’ and 39’ poles. The scope of work includes the approach roads, as well as the parking lot. A test area was installed with various

Posted in Projects

Central Piedmont Community College

Charlotte, NC -Student Parking Deck 2 Deck had 175w metal halide fixtures on parking levels. It was decided to replace them with 4L T8 vaportight fluorescent fixtures. Top level only had 16-400w metal halide shoeboxes on 30’ poles. These were

Posted in Projects

Lenoir Community College

Kinston, NC LED lighting was used extensively on this project and most of the exterior lighting (wallpacks and pole lighting) was retrofitted with LED fixtures. Existing lighting was a mixture of 250w and 400w metal halide shoeboxes and floods, mostly

Posted in Projects

HHS Cafeteria After

When we began work on this project, this cafeteria was using about 8.5 kw of power with metal halides.They were spaced very far apart and left the area with an average light level of 9 FC, below the acceptable level.

Posted in Projects

Knox County Phase IIIC

Carter High School Carter High School is a 200,000 sq ft high school in Knox County Tennessee. We reduced their energy consumption by 27,8350.27 kwh and kept their payback under 6 years while maintaining IES lighting standards. We used 21w

Posted in Projects

Lighting Consulting

We’re an aggregate of product knowledge in the lighting industry.

Posted in Projects